Brief update from DPW today to say that the electrical and plumbing are being installed for the beach restrooms and thus a 3-foot-deep trench exists where the asphalt of the steep road down to the beach parking lot ends and the gravel begins. Again, this road should be considered closed to traffic for now, but if anyone does venture down there by wheeled conveyance or on foot, please be forewarned that there’s a big hole there.
Discussion about this post
No posts